Piramal Pharma Hiring For Production Dept
![]() |
Piramal Pharma Hiring For Production Dept |
Department: Production
Position: Deputy Manager
Location: Dhar, Piramal Enterprises Limited, Plot # 67-70, Sector II, Dhar, Madhya Pradesh, 454775,
Qualification: B. Pharma
Responsibilities:
- Allocates workmen for different workstations on shift-to-shift basis.
- Supervises the line operations and participates in Validation activities as per the protocol.
- Checks and cross-verify line clearance during Batch changeover.
- Checks the issued packing material before taking it into the production line.
- Maintains c-GMP practices along with documentation in various records.
- Fills in-process parameters/Reconciliation in packaging documentation.
- Fills and checks BPR before submission to the superiors.
- Handles minor setting issues, Serialization and aggregation in machines.
- Monitors the speed of the machine and output according to the run time.
- Imparts on job/ Classroom training to the workmen for SOP and cGMP systems.
- Monitors and reports the unauthorized movement of workmen from the line.
- Take-up the responsibilities of the immediate supervisor for the section in his absence.
- Preparation of new SOPs and updation of existing SOPs.
- Perform the investigation of market complaints and Event.
- Reports on day-to-day basis activities in SAP system.
- Verifies the balances on daily and monthly basis.
- Maintenances and calibration of various instruments and equipment.
- Participate in machine qualification activities.
- Check all the calibration tags of equipment, instruments, and fire extinguishers for their due date time to time.
- Knowledge and involvement in SFTI, OEE, DHM & 5S Activities.
- Knowledge and involvement in ISO 14000 & 13485 and EHS compliance (Near Miss reporting, UA & UC).
- Any other activity from time to time which his supervisor/company feels appropriate.
- Raise the material requisition note (MRQN) wherever extra quantity of packing material is required.
- Prepare and cross-verify the material return note (MRN) after the completion batch/product campaign.
- Prepare the line rejection note (LRN) wherever required.
- Generation of required shipper labels/Bundle labels of the product.
- Transfer the batch and do the BSR entry in the SAP system.
How To Apply:
Click here for Apply
Post a Comment